ITAC Assessment: UA0254
ITAC logo
ITAC Assessment: UA0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Flooring Tiles
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 7,344
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $639,932 12,620,120
kWh
Electricity Demand $526,244 41,890
kW-mo/yr
Electricity Fees $31,475 -
Natural Gas $92,022 22,026
MMBtu
TOTAL YEARLY COSTS $1,289,673
RECOMMENDED SAVINGS* $63,231 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $50,108 $47,329 $33,490
660,458
kWh
$15,301
-
kW-mo/yr
$1,317
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,515 $12,000 $1,833
36,150
kWh
$616
-
kW-mo/yr
$66
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,608 $2,502 $7,043
138,897
kWh
$3,286
-
kW-mo/yr
$279
TOTAL RECOMMENDED $63,231 $61,831 $42,366
835,505
kWh
$19,203
-
kW-mo/yr
$1,662
TOTAL IMPLEMENTED $60,716 $49,831 $40,533
799,355
kWh
$18,587
-
kW-mo/yr
$1,596
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs