ITAC Assessment: UA0248
ITAC logo
ITAC Assessment: UA0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Automotive axles
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 350
Plant Area 160,000
ft2
Annual Production 350,000
units
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $314,950 4,484,104
kWh
Electricity Demand $56,270 10,505
kW-mo/yr
Electricity Fees $28,525 -
Natural Gas $26,185 2,004
MMBtu
TOTAL YEARLY COSTS $425,930
RECOMMENDED SAVINGS* $9,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,955

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,182 $9,020 $4,222
60,108
kWh
$590
-
kW-mo/yr
$370
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,679 $2,002 $2,347
33,415
kWh
$141
-
kW-mo/yr
$191
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,366 $100 $1,127
16,041
kWh
$142
-
kW-mo/yr
$97
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $94 $274 $57
815
kWh
$31
-
kW-mo/yr
$6
TOTAL RECOMMENDED $9,321 $11,396 $7,753
110,379
kWh
$904
-
kW-mo/yr
$664
TOTAL IMPLEMENTED $7,955 $11,296 $6,626
94,338
kWh
$762
-
kW-mo/yr
$567
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs