ITAC Assessment: UA0245
ITAC logo
ITAC Assessment: UA0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area 610,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,870,617 32,852,780
kWh
Electricity Demand $252,178 51,803
kW-mo/yr
Electricity Fees $43,305 -
TOTAL YEARLY COSTS $2,166,100
RECOMMENDED SAVINGS* $86,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $45,808 $43,308 $40,185
705,744
kWh
$4,707
-
kW-mo/yr
$916
02 2.7134: Use photocell controls $323 $197 $317
5,464
kWh
- $6
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,374 $22,712 $18,747
329,240
kWh
$2,200
-
kW-mo/yr
$427
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,257 $1,579 $8,014
140,742
kWh
$78
-
kW-mo/yr
$165
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,365 $250 $9,060
159,112
kWh
$1,098
-
kW-mo/yr
$207
06 2.7224: Reduce space conditioning during non-working hours $317 $450 $311
5,460
kWh
- $6
TOTAL RECOMMENDED $86,444 $68,496 $76,634
1,345,762
kWh
$8,083
-
kW-mo/yr
$1,727
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs