Assessment Year | 2021 |
---|---|
Principal Product | Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 10 |
Plant Area |
850,000
ft2
|
Annual Production | 5,700,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $866,134 | 14,146,758 |
kWh
|
$0.061 |
Electricity Demand | $125,248 | 25,603 |
kW-mo/yr
|
$4.89 |
Electricity Fees | $(-56,622.0) | - |
|
- |
TOTAL YEARLY COSTS | $934,760 | |||
RECOMMENDED SAVINGS* | $460,118 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,477 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,477 | $3,209 |
$3,321
54,242
kWh
|
$367
-
kW-mo/yr
|
$(-211.0) | - | - | |
02 | 2.7135: Install occupancy sensors | $893 | $282 |
$947
15,474
kWh
|
- | $(-54.0) | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $54,839 | $180,000 |
$58,159
950,000
kWh
|
- | $(-3,320.0) | - | - | |
04 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $283,379 | $2,501,328 |
$398,998
6,517,440
kWh
|
$43,676
-
kW-mo/yr
|
$(-25,277.0) | $(-134,018.0) | - | |
05 | 3.6192: Use a less expensive method of waste removal | $117,530 | $1,000 | - | - | - | - | $117,530 | |
TOTAL RECOMMENDED | $460,118 | $2,685,819 |
$461,425
7,537,156
kWh
|
$44,043
-
kW-mo/yr
|
$(-28,862.0) | $(-134,018.0) | $117,530 | ||
TOTAL IMPLEMENTED | $3,477 | $3,209 |
$3,321
54,242
kWh
|
$367
-
kW-mo/yr
|
$(-211.0) | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs