| Assessment Year | 2021 |
|---|---|
| Principal Product | Rubber and Vinyl Flooring |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
250,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $838,893 | 11,935,200 |
kWh
|
$0.070 |
| Electricity Demand | $636,248 | 50,791 |
kW-mo/yr
|
$12.53 |
| Electricity Fees | $(-125,129.0) | - |
|
- |
| Natural Gas | $129,701 | 50,362 |
MMBtu
|
$2.58 |
| TOTAL YEARLY COSTS | $1,479,713 | |||
| RECOMMENDED SAVINGS* | $75,856 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $24,484 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,385 | $59 |
$799
11,362
kWh
|
$714
-
kW-mo/yr
|
$(-128.0) | - | |
| 02 | 2.3212: Optimize plant power factor | $36,295 | $6,449 | - |
$39,660
-
kW-mo/yr
|
$(-3,365.0) | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,142 | $9,682 |
$17,859
254,071
kWh
|
$3,057
-
kW-mo/yr
|
$(-1,774.0) | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,957 | $4,986 |
$3,184
45,294
kWh
|
$1,140
-
kW-mo/yr
|
$(-367.0) | - | |
| 05 | 2.7231: Use radiant heater for spot heating | $15,077 | $22,703 | - | - | - |
$15,077
-
MMBtu
|
|
| TOTAL RECOMMENDED | $75,856 | $43,879 |
$21,842
310,727
kWh
|
$44,571
-
kW-mo/yr
|
$(-5,634.0) |
$15,077
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $24,484 | $14,727 |
$21,842
310,727
kWh
|
$4,911
-
kW-mo/yr
|
$(-2,269.0) | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs