ITAC Assessment: UA0239
ITAC logo
ITAC Assessment: UA0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive Structural Parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 139
Plant Area 260,000
ft2
Annual Production 415,000
units
Production Hrs. Annual 5,880
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $282,757 7,289,467
kWh
Electricity Demand $52,633 9,857
kW-mo/yr
Electricity Fees $28,353 -
Natural Gas $247,240 29,274
MMBtu
TOTAL YEARLY COSTS $610,983
RECOMMENDED SAVINGS* $51,003 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,194 $50 $2,114
54,531
kWh
$667
-
kW-mo/yr
$413 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,993 $2,238 $1,972
50,866
kWh
$634
-
kW-mo/yr
$387 -
03 2.3212: Optimize plant power factor $12,847 $4,947 - - $12,847 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,348 $23,987 $6,308
162,748
kWh
$1,831
-
kW-mo/yr
$1,209 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $364 $51 $248
6,392
kWh
$69
-
kW-mo/yr
$47 -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,641 $9,144 $1,794
46,289
kWh
$504
-
kW-mo/yr
$343 -
07 2.7241: Install outside air damper / economizer on hvac unit $18,822 $2,500 $16,388
422,812
kWh
- $2,434 -
08 2.7231: Use radiant heater for spot heating $794 $709 - - - $794
-
MMBtu
TOTAL RECOMMENDED $51,003 $43,626 $28,824
743,638
kWh
$3,705
-
kW-mo/yr
$17,680 $794
-
MMBtu
TOTAL IMPLEMENTED $15,899 $26,326 $10,642
274,537
kWh
$3,201
-
kW-mo/yr
$2,056 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs