ITAC Assessment: UA0233
ITAC logo
ITAC Assessment: UA0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beer and Spirits
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 8,500
ft2
Annual Production 200
Tgal
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,244 647,640
kWh
Electricity Demand $7,432 1,894
kW-mo/yr
Electricity Fees $9,441 -
Natural Gas $22,395 1,908
MMBtu
TOTAL YEARLY COSTS $108,512
RECOMMENDED SAVINGS* $21,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings By-product Production Savings
01 3.5317: Sell / offer by-product as animal feed $16,058 $600 - - - $16,058
02 2.4239: Eliminate or reduce compressed air usage $848 $50 $727
6,805
kWh
$37
-
kW-mo/yr
$84 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $260 $1,068 $223
2,092
kWh
$11
-
kW-mo/yr
$26 -
04 2.7224: Reduce space conditioning during non-working hours $3,500 $20 $3,154
29,500
kWh
- $346 -
05 2.7135: Install occupancy sensors $658 $185 $593
5,550
kWh
- $65 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $104 $830 $78
734
kWh
$16
-
kW-mo/yr
$10 -
07 2.7447: Install vinyl strip / high speed / air curtain doors $39 $25 $35
332
kWh
- $4 -
TOTAL RECOMMENDED $21,467 $2,778 $4,810
45,013
kWh
$64
-
kW-mo/yr
$535 $16,058
TOTAL IMPLEMENTED $5,266 $1,323 $4,697
43,947
kWh
$48
-
kW-mo/yr
$521 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs