ITAC Assessment: UA0231
ITAC logo
ITAC Assessment: UA0231
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Metal Parts
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 85,280
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,104 1,426,200
kWh
Electricity Demand $71,278 5,455
kW-mo/yr
Electricity Fees $21,168 -
Natural Gas $4,668 394
MMBtu
TOTAL YEARLY COSTS $197,218
RECOMMENDED SAVINGS* $64,633 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7243: Improve air circulation with destratification fans / other methods $37,963 $29,625 $23,272
331,563
kWh
$10,518
-
kW-mo/yr
$4,173
02 2.6218: Turn off equipment when not in use $538 $121 $479
6,828
kWh
- $59
03 2.7142: Utilize higher efficiency lamps and/or ballasts $17,318 $21,905 $9,506
135,432
kWh
$5,908
-
kW-mo/yr
$1,904
04 2.3511: Use plant owned transformers or lease transformers $3,981 $17,881 $(-784.0)
(-11,169)
kWh
- $4,765
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,885 $500 $1,208
17,215
kWh
$470
-
kW-mo/yr
$207
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,948 $4,200 $2,044
29,127
kWh
$580
-
kW-mo/yr
$324
TOTAL RECOMMENDED $64,633 $74,232 $35,725
508,996
kWh
$17,476
-
kW-mo/yr
$11,432
TOTAL IMPLEMENTED $5,371 $4,821 $3,731
53,170
kWh
$1,050
-
kW-mo/yr
$590
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs