ITAC Assessment: UA0225
ITAC logo
ITAC Assessment: UA0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Hardwood Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area 1,440,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,574 3,959,838
kWh
Electricity Fees $(-8,346.0) -
TOTAL YEARLY COSTS $311,228
RECOMMENDED SAVINGS* $44,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,822

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,563 $12,609 $19,127
236,998
kWh
$(-564.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,568 $8,775 $5,737
71,092
kWh
$(-169.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $7,691 $50 $7,925
98,208
kWh
$(-234.0) -
04 4.454: Modify startup/shutdown times $12,578 $150 - $(-382.0) $12,960
TOTAL RECOMMENDED $44,400 $21,584 $32,789
406,298
kWh
$(-1,349.0) $12,960
TOTAL IMPLEMENTED $31,822 $21,434 $32,789
406,298
kWh
$(-967.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs