ITAC Assessment: UA0224
ITAC logo
ITAC Assessment: UA0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Aircraft Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area 95,000
ft2
Annual Production 33,457
units
Production Hrs. Annual 4,056
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $410,162 5,091,697
kWh
Electricity Fees $22,276 -
Natural Gas $43,761 3,746
MMBtu
Waste Disposal Costs
Water Usage $37,139 3,571
Tgal
TOTAL YEARLY COSTS $513,338
RECOMMENDED SAVINGS* $57,827 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,443 $2,681 $1,369
16,992
kWh
$74 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $12,645 $50 $11,994
148,888
kWh
$651 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,994 $9,795 $5,685
70,574
kWh
$309 -
04 2.2414: Use waste heat from hot flue gases to preheat $6,259 $16,524 - - $6,259
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,983 $20,013 $23,253
288,642
kWh
$1,263 $(-13,533.0)
-
MMBtu
06 2.7226: Use computer programs to optimize hvac performance $20,503 $12,612 $19,447
241,403
kWh
$1,056 -
TOTAL RECOMMENDED $57,827 $61,675 $61,748
766,499
kWh
$3,353 $(-7,274.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs