ITAC Assessment: UA0222
ITAC logo
ITAC Assessment: UA0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Automotive Metal Parts
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 197,056
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $515,943 8,318,676
kWh
Electricity Demand $111,769 20,240
kW-mo/yr
Electricity Fees $65,347 -
TOTAL YEARLY COSTS $693,059
RECOMMENDED SAVINGS* $111,457 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $32,232 $92,405 $23,224
374,459
kWh
$5,969
-
kW-mo/yr
$3,039
02 2.3212: Optimize plant power factor $12,593 $6,955 - $11,406
-
kW-mo/yr
$1,187
03 2.8112: Combine utility meters $26,371 $60,000 - - $26,371
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,527 $7,775 $8,518
137,340
kWh
$1,016
-
kW-mo/yr
$993
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,178 $50 $5,733
92,438
kWh
$768
-
kW-mo/yr
$677
06 2.7241: Install outside air damper / economizer on hvac unit $22,556 $500 $20,429
329,389
kWh
- $2,127
TOTAL RECOMMENDED $111,457 $167,685 $57,904
933,626
kWh
$19,159
-
kW-mo/yr
$34,394
TOTAL IMPLEMENTED $42,759 $100,180 $31,742
511,799
kWh
$6,985
-
kW-mo/yr
$4,032
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs