| Assessment Year | 2020 |
|---|---|
| Principal Product | Automotive Metal Parts |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $10 M to 50M |
| # of Employees | 220 |
| Plant Area |
197,056
ft2
|
| Annual Production | 36,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $515,943 | 8,318,676 |
kWh
|
$0.062 |
| Electricity Demand | $111,769 | 20,240 |
kW-mo/yr
|
$5.52 |
| Electricity Fees | $65,347 | - |
|
- |
| TOTAL YEARLY COSTS | $693,059 | |||
| RECOMMENDED SAVINGS* | $111,457 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,759 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,232 | $92,405 |
$23,224
374,459
kWh
|
$5,969
-
kW-mo/yr
|
$3,039 | |
| 02 | 2.3212: Optimize plant power factor | $12,593 | $6,955 | - |
$11,406
-
kW-mo/yr
|
$1,187 | |
| 03 | 2.8112: Combine utility meters | $26,371 | $60,000 | - | - | $26,371 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,527 | $7,775 |
$8,518
137,340
kWh
|
$1,016
-
kW-mo/yr
|
$993 | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,178 | $50 |
$5,733
92,438
kWh
|
$768
-
kW-mo/yr
|
$677 | |
| 06 | 2.7241: Install outside air damper / economizer on hvac unit | $22,556 | $500 |
$20,429
329,389
kWh
|
- | $2,127 | |
| TOTAL RECOMMENDED | $111,457 | $167,685 |
$57,904
933,626
kWh
|
$19,159
-
kW-mo/yr
|
$34,394 | ||
| TOTAL IMPLEMENTED | $42,759 | $100,180 |
$31,742
511,799
kWh
|
$6,985
-
kW-mo/yr
|
$4,032 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs