ITAC Assessment: UA0218
ITAC logo
ITAC Assessment: UA0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product fresh water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area 12,000
ft2
Annual Production 1,877,668
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,504 5,438,400
kWh
Electricity Demand $95,613 16,506
kW-mo/yr
Electricity Fees $(-16,751.0) -
TOTAL YEARLY COSTS $440,366
RECOMMENDED SAVINGS* $43,509 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,252

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,378 $6,360 $5,914
88,978
kWh
$706
-
kW-mo/yr
$(-242.0)
02 2.7135: Install occupancy sensors $1,874 $198 $1,945
29,265
kWh
- $(-71.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $27,441 $2,000 - $28,483
-
kW-mo/yr
$(-1,042.0)
04 2.3212: Optimize plant power factor $7,816 $6,955 - $8,113
-
kW-mo/yr
$(-297.0)
TOTAL RECOMMENDED $43,509 $15,513 $7,859
118,243
kWh
$37,302
-
kW-mo/yr
$(-1,652.0)
TOTAL IMPLEMENTED $8,252 $6,558 $7,859
118,243
kWh
$706
-
kW-mo/yr
$(-313.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs