ITAC Assessment: UA0210
ITAC logo
ITAC Assessment: UA0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Wood Pellets
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 31
Plant Area 130,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,478 3,040,920
kWh
Electricity Demand $62,992 12,173
kW-mo/yr
Electricity Fees $38,517 -
TOTAL YEARLY COSTS $291,987
RECOMMENDED SAVINGS* $29,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,983 $12,313 $9,832
156,974
kWh
$1,438
-
kW-mo/yr
$1,713
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,939 $100 $2,817
44,974
kWh
$602
-
kW-mo/yr
$520
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,087 $1,345 $4,657
74,345
kWh
$627
-
kW-mo/yr
$803
04 2.7232: Replace existing hvac unit with high efficiency model $6,278 $14,550 $4,380
69,931
kWh
$1,070
-
kW-mo/yr
$828
TOTAL RECOMMENDED $29,287 $28,308 $21,686
346,224
kWh
$3,737
-
kW-mo/yr
$3,864
TOTAL IMPLEMENTED $23,009 $13,758 $17,306
276,293
kWh
$2,667
-
kW-mo/yr
$3,036
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs