Assessment Year | 2019 |
---|---|
Principal Product | Wood Pellets |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 31 |
Plant Area |
130,000
ft2
|
Annual Production | 60,000
ton
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,478 | 3,040,920 |
kWh
|
$0.063 |
Electricity Demand | $62,992 | 12,173 |
kW-mo/yr
|
$5.17 |
Electricity Fees | $38,517 | - |
|
- |
TOTAL YEARLY COSTS | $291,987 | |||
RECOMMENDED SAVINGS* | $29,287 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,009 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,983 | $12,313 |
$9,832
156,974
kWh
|
$1,438
-
kW-mo/yr
|
$1,713 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,939 | $100 |
$2,817
44,974
kWh
|
$602
-
kW-mo/yr
|
$520 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,087 | $1,345 |
$4,657
74,345
kWh
|
$627
-
kW-mo/yr
|
$803 | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $6,278 | $14,550 |
$4,380
69,931
kWh
|
$1,070
-
kW-mo/yr
|
$828 | |
TOTAL RECOMMENDED | $29,287 | $28,308 |
$21,686
346,224
kWh
|
$3,737
-
kW-mo/yr
|
$3,864 | ||
TOTAL IMPLEMENTED | $23,009 | $13,758 |
$17,306
276,293
kWh
|
$2,667
-
kW-mo/yr
|
$3,036 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs