Assessment Year | 2018 |
---|---|
Principal Product | Overcoats |
NAICS | 315280: Other Cut and Sew Apparel Manufacturing |
SIC | 2385: Waterproof Outerwear |
Sales Range | $5 M to 10M |
# of Employees | 236 |
Plant Area |
162,348
ft2
|
Annual Production | 239,905
units
|
Production Hrs. Annual | 2,100
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $242,948 | 2,819,558 |
kWh
|
$0.086 | |
Electricity Demand | $143,517 | 9,535 |
kW-mo/yr
|
$15.05 | |
Electricity Fees | $35,587 | - |
|
- | |
Natural Gas | $24,253 | 1,850 |
MMBtu
|
$13.11 | |
Waste Disposal Costs | |||||
Water Usage | $5,364 | 1,037,000 |
Tgal
|
$0.005 | |
TOTAL YEARLY COSTS | $451,669 | ||||
RECOMMENDED SAVINGS* | $72,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $72,429 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $66,234 | $104,269 |
$28,912
335,528
kWh
|
$28,859
-
kW-mo/yr
|
$8,463 | - | |
02 | 2.7135: Install occupancy sensors | $238 | $145 |
$208
2,410
kWh
|
- | $30 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,219 | $250 |
$1,556
18,056
kWh
|
$1,252
-
kW-mo/yr
|
$411 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,537 | $1,285 |
$1,404
16,296
kWh
|
$809
-
kW-mo/yr
|
$324 | - | |
05 | 2.2511: Insulate bare equipment | $439 | $1,082 | - | - | - |
$439
-
MMBtu
|
|
TOTAL RECOMMENDED | $72,667 | $107,031 |
$32,080
372,290
kWh
|
$30,920
-
kW-mo/yr
|
$9,228 |
$439
-
MMBtu
|
||
TOTAL IMPLEMENTED | $72,429 | $106,886 |
$31,872
369,880
kWh
|
$30,920
-
kW-mo/yr
|
$9,198 |
$439
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs