ITAC Assessment: UA0204
ITAC logo
ITAC Assessment: UA0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Overcoats
NAICS 315280: Other Cut and Sew Apparel Manufacturing
SIC 2385: Waterproof Outerwear
Sales Range $5
M
to 10
M
# of Employees 236
Plant Area 162,348
ft2
Annual Production 239,905
units
Production Hrs. Annual 2,100
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,948 2,819,558
kWh
Electricity Demand $143,517 9,535
kW-mo/yr
Electricity Fees $35,587 -
Natural Gas $24,253 1,850
MMBtu
Waste Disposal Costs
Water Usage $5,364 1,037,000
Tgal
TOTAL YEARLY COSTS $451,669
RECOMMENDED SAVINGS* $72,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $66,234 $104,269 $28,912
335,528
kWh
$28,859
-
kW-mo/yr
$8,463 -
02 2.7135: Install occupancy sensors $238 $145 $208
2,410
kWh
- $30 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,219 $250 $1,556
18,056
kWh
$1,252
-
kW-mo/yr
$411 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,537 $1,285 $1,404
16,296
kWh
$809
-
kW-mo/yr
$324 -
05 2.2511: Insulate bare equipment $439 $1,082 - - - $439
-
MMBtu
TOTAL RECOMMENDED $72,667 $107,031 $32,080
372,290
kWh
$30,920
-
kW-mo/yr
$9,228 $439
-
MMBtu
TOTAL IMPLEMENTED $72,429 $106,886 $31,872
369,880
kWh
$30,920
-
kW-mo/yr
$9,198 $439
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs