ITAC Assessment: NC0048
ITAC logo
ITAC Assessment: NC0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Power Transmission Components
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 62,500
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,735 1,625,733
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,504 - $1,504
-
kWh
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $112 $100 $112
2,052
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $38 $195
3,517
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $589 $180 $589
10,551
kWh
05 2.7111: Reduce illumination to minimum necessary levels $3,762 $1,000 $3,762
65,944
kWh
06 2.2511: Insulate bare equipment $2,212 $6,061 $2,212
38,687
kWh
TOTAL RECOMMENDED $8,374 $7,379 $8,374
120,751
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs