Assessment Year | 2018 |
---|---|
Principal Product | Tiles |
NAICS | 327120: Clay Building Material and Refractories Manufacturing |
SIC | 3253: Ceramic Wall and Floor Tile |
Sales Range | $10 M to 50M |
# of Employees | 86 |
Plant Area |
252,000
ft2
|
Annual Production | 13,242,878
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $491,363 | 7,119,188 |
kWh
|
$0.069 |
Natural Gas | $807,055 | 203,261 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | $1,298,418 | |||
RECOMMENDED SAVINGS* | $53,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,369 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $32,926 | $41,196 |
$32,926
486,929
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $894 | $550 |
$894
13,217
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,166 | $1,227 |
$2,166
31,565
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,798 | $1,165 |
$1,798
26,578
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,660 | $100 |
$3,660
54,421
kWh
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $3,085 | $3,000 |
$3,085
45,623
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $7,511 | $3,443 | - |
$7,511
-
MMBtu
|
- | |
08 | 2.1331: Burn a less expensive grade of fuel | $1,051 | $1,325 | - | - | $1,051 | |
TOTAL RECOMMENDED | $53,091 | $52,006 |
$44,529
658,333
kWh
|
$7,511
-
MMBtu
|
$1,051 | ||
TOTAL IMPLEMENTED | $12,369 | $6,385 |
$4,858
71,360
kWh
|
$7,511
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Primary Product Savings |