ITAC Assessment: UA0192
ITAC logo
ITAC Assessment: UA0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Carpet textiles
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 225,000
ft2
Annual Production 39,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,973,662 36,403,772
kWh
Electricity Demand $272,410 61,276
kW-mo/yr
Electricity Fees $(-86,892.0) -
Natural Gas $278,544 55,220
MMBtu
TOTAL YEARLY COSTS $2,437,724
RECOMMENDED SAVINGS* $210,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122,582

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,821 $22,134 $14,723
274,915
kWh
$1,674
-
kW-mo/yr
$(-576.0)
02 2.7135: Install occupancy sensors $1,298 $366 $1,351
25,222
kWh
- $(-53.0)
03 2.4231: Reduce the pressure of compressed air to the minimum required $14,416 $200 $15,003
280,117
kWh
- $(-587.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $31,273 $3,165 $32,546
607,659
kWh
- $(-1,273.0)
05 2.7241: Install outside air damper / economizer on hvac unit $76,893 $19,300 $80,022
1,494,063
kWh
- $(-3,129.0)
06 2.4133: Use most efficient type of electric motors $70,431 $386,914 $65,075
1,214,991
kWh
$8,222
-
kW-mo/yr
$(-2,866.0)
TOTAL RECOMMENDED $210,132 $432,079 $208,720
3,896,967
kWh
$9,896
-
kW-mo/yr
$(-8,484.0)
TOTAL IMPLEMENTED $122,582 $22,665 $127,571
2,381,839
kWh
- $(-4,989.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs