ITAC Assessment: UA0189
ITAC logo
ITAC Assessment: UA0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Bread
NAICS 311811: Retail Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 87,000
ft2
Annual Production 45,000,000
lb
Production Hrs. Annual 8,597
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,263 4,813,500
kWh
Electricity Demand $39,696 9,694
kW-mo/yr
Electricity Fees $42,570 -
Natural Gas $225,215 26,842
MMBtu
TOTAL YEARLY COSTS $564,744
RECOMMENDED SAVINGS* $51,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,288

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $21,964 $45,000 - - - $21,964
-
MMBtu
02 2.6218: Turn off equipment when not in use $13,298 $50 - - - $13,298
-
MMBtu
03 2.2163: Use minimum steam operating pressure $3,482 $50 - - - $3,482
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,745 $5,828 $4,813
90,058
kWh
$594
-
kW-mo/yr
$338 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,704 $100 $3,113
58,242
kWh
$373
-
kW-mo/yr
$218 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,357 $3,000 $2,860
53,509
kWh
$300
-
kW-mo/yr
$197 -
TOTAL RECOMMENDED $51,550 $54,028 $10,786
201,809
kWh
$1,267
-
kW-mo/yr
$753 $38,744
-
MMBtu
TOTAL IMPLEMENTED $16,288 $8,978 $10,786
201,809
kWh
$1,267
-
kW-mo/yr
$753 $3,482
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs