Assessment Year 2018
Principal Product Processed Chicken
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 352
Plant Area 50,000
ft2
Annual Production 51,272,881
units
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $751,353 13,913,597
kWh
Electricity Demand $147,000 34,230
kW-mo/yr
Electricity Fees $46,977 -
Natural Gas $399,984 46,308
MMBtu
Waste Disposal Costs
Water Usage $732,983 24,012,800
Tgal
TOTAL YEARLY COSTS $2,078,297
RECOMMENDED SAVINGS* $121,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $81,560 $200,000 - - - $81,560
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $2,707 $7,500 - - - $2,707
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $25,552 $64,329 $21,686
401,582
kWh
$2,596
-
kW-mo/yr
$1,270 -
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,516 $500 $4,196
77,696
kWh
$1,046
-
kW-mo/yr
$274 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,745 $2,465 $3,998
74,036
kWh
$511
-
kW-mo/yr
$236 -
06 2.6218: Turn off equipment when not in use $1,389 $737 $1,320
24,450
kWh
- $69 -
TOTAL RECOMMENDED $121,469 $275,531 $31,200
577,764
kWh
$4,153
-
kW-mo/yr
$1,849 $84,267
-
MMBtu
TOTAL IMPLEMENTED $11,650 $3,702 $9,514
176,182
kWh
$1,557
-
kW-mo/yr
$579 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs