Assessment Year | 2017 |
---|---|
Principal Product | Farm Equipment |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
160,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,651 | 1,247,880 |
kWh
|
$0.077 |
Electricity Fees | $18,716 | - |
|
- |
Natural Gas | $532 | 45 |
MMBtu
|
$11.82 |
TOTAL YEARLY COSTS | $115,899 | |||
RECOMMENDED SAVINGS* | $31,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,097 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,700 | $31,835 |
$11,876
153,339
kWh
|
$824 | - | |
02 | 2.7134: Use photocell controls | $4,515 | $5,556 |
$4,222
54,511
kWh
|
$293 | - | |
03 | 2.1331: Burn a less expensive grade of fuel | $4,865 | $13,083 |
$11,831
152,755
kWh
|
$316 |
$(-7,282.0)
-
MMBtu
|
|
04 | 4.454: Modify startup/shutdown times | $5,696 | - | - | $5,696 | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,024 | $500 |
$1,893
24,444
kWh
|
$131 | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,373 | $1,365 |
$1,284
16,581
kWh
|
$89 | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $433 | $294 |
$405
5,235
kWh
|
$28 | - | |
TOTAL RECOMMENDED | $31,606 | $52,633 |
$31,511
406,865
kWh
|
$7,377 |
$(-7,282.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,097 | $33,700 |
$15,053
194,364
kWh
|
$1,044 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs