Assessment Year | 2017 |
---|---|
Principal Product | Hardwood Flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $50 M to 100M |
# of Employees | 235 |
Plant Area |
200,000
ft2
|
Annual Production | 23,000,000
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $751,602 | 25,360,333 |
kWh
|
$0.030 |
Electricity Demand | $647,456 | 45,363 |
kW-mo/yr
|
$14.27 |
Electricity Fees | $99,613 | - |
|
- |
Natural Gas | $17,511 | 2,394 |
MMBtu
|
$7.31 |
Wood | $78,880 | 144,236 |
MMBtu
|
$0.55 |
TOTAL YEARLY COSTS | $1,595,062 | |||
RECOMMENDED SAVINGS* | $197,255 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,068 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Wood Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $113,456 | $170,734 |
$63,986
2,158,769
kWh
|
$42,406
-
kW-mo/yr
|
$7,064 | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $32,696 | $2,784 |
$13,519
456,100
kWh
|
$17,138
-
kW-mo/yr
|
$2,039 | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,380 | $8,066 |
$5,045
170,217
kWh
|
- | $335 | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,371 | $5,551 |
$1,286
43,372
kWh
|
- | $85 | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,749 | $2,465 |
$6,467
218,192
kWh
|
$10,177
-
kW-mo/yr
|
$1,105 | - | - | |
06 | 2.6218: Turn off equipment when not in use | $8,680 | $3,125 |
$8,140
274,617
kWh
|
- | $540 | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,400 | $500 |
$2,126
71,743
kWh
|
$2,000
-
kW-mo/yr
|
$274 | - | - | |
08 | 2.2447: Heat water with exhaust heat | $10,960 | $97,000 | - | - | - | - |
$10,960
-
MMBtu
|
|
09 | 2.2437: Recover waste heat from equipment | $2,563 | $4,224 | - | - | - |
$2,563
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $197,255 | $294,449 |
$100,569
3,393,010
kWh
|
$71,721
-
kW-mo/yr
|
$11,442 |
$2,563
-
MMBtu
|
$10,960
-
MMBtu
|
||
TOTAL IMPLEMENTED | $67,068 | $20,664 |
$33,171
1,119,126
kWh
|
$27,315
-
kW-mo/yr
|
$4,019 |
$2,563
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs