ITAC Assessment: UA0182
ITAC logo
ITAC Assessment: UA0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Hardwood Flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 200,000
ft2
Annual Production 23,000,000
units
Production Hrs. Annual 4,250
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $751,602 25,360,333
kWh
Electricity Demand $647,456 45,363
kW-mo/yr
Electricity Fees $99,613 -
Natural Gas $17,511 2,394
MMBtu
Wood $78,880 144,236
MMBtu
TOTAL YEARLY COSTS $1,595,062
RECOMMENDED SAVINGS* $197,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $113,456 $170,734 $63,986
2,158,769
kWh
$42,406
-
kW-mo/yr
$7,064 - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $32,696 $2,784 $13,519
456,100
kWh
$17,138
-
kW-mo/yr
$2,039 - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,380 $8,066 $5,045
170,217
kWh
- $335 - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,371 $5,551 $1,286
43,372
kWh
- $85 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,749 $2,465 $6,467
218,192
kWh
$10,177
-
kW-mo/yr
$1,105 - -
06 2.6218: Turn off equipment when not in use $8,680 $3,125 $8,140
274,617
kWh
- $540 - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,400 $500 $2,126
71,743
kWh
$2,000
-
kW-mo/yr
$274 - -
08 2.2447: Heat water with exhaust heat $10,960 $97,000 - - - - $10,960
-
MMBtu
09 2.2437: Recover waste heat from equipment $2,563 $4,224 - - - $2,563
-
MMBtu
-
TOTAL RECOMMENDED $197,255 $294,449 $100,569
3,393,010
kWh
$71,721
-
kW-mo/yr
$11,442 $2,563
-
MMBtu
$10,960
-
MMBtu
TOTAL IMPLEMENTED $67,068 $20,664 $33,171
1,119,126
kWh
$27,315
-
kW-mo/yr
$4,019 $2,563
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs