ITAC Assessment: TN0628
ITAC logo
ITAC Assessment: TN0628
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Inert catalyst bed supports and random tower packing
NAICS
n/a
SIC 3259: Structural Clay Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 162,000
ft2
Annual Production 700
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,917 5,255,862
kWh
Electricity Demand $76,499 8,757
kW-mo/yr
Electricity Fees $3,827 -
Natural Gas $630,773 191,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.652: Replace existing equipment with more suitable substitutes $82,700 $77,200 $(-500.0)
(-14,654)
kWh
- - - - $83,200 - - -
02 4.122: Develop standard procedures to improve internal yields $24,400 - - - $5,400
-
MMBtu
- - - - $6,890 $12,110
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $10,420 $25,600 $(-500.0)
(-14,654)
kWh
- - - $6,840
-
lb
- $4,080 - -
04 3.5311: Recover and reuse waste material $5,910 $16,880 - - - - - - - $2,140 $3,770
05 3.4116: Meter recycled water (to reduce sewer charges) $5,815 $5,600 - - - $5,815
-
Tgal
- - - - -
06 4.322: Eliminate old stock and modify inventory control $3,690 $10,500 - - - - - - $3,690 - -
07 2.2511: Insulate bare equipment $2,610 $940 - - $2,610
-
MMBtu
- - - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,560 $2,170 $1,490
43,962
kWh
$1,070
-
kW-mo/yr
- - - - - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,950 - $1,000
29,308
kWh
$950
-
kW-mo/yr
- - - - - - -
10 3.5313: Increase amount of waste recovered for resale $1,835 - - - - - $1,835
-
lb
- - - -
TOTAL RECOMMENDED $141,890 $138,890 $1,490
43,962
kWh
$2,020
-
kW-mo/yr
$8,010
-
MMBtu
$5,815
-
Tgal
$8,675
-
lb
$83,200 $7,770 $9,030 $15,880
TOTAL IMPLEMENTED $44,325 $35,150 $2,490
73,270
kWh
$2,020
-
kW-mo/yr
$5,400
-
MMBtu
$5,815
-
Tgal
- - $3,690 $9,030 $15,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs