Assessment Year | 2017 |
---|---|
Principal Product | Car Panels |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $50 M to 100M |
# of Employees | 1,000 |
Plant Area |
800,000
ft2
|
Annual Production | 3,000,000
units
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,388,499 | 45,495,219 |
kWh
|
$0.053 |
Electricity Demand | $360,356 | 94,010 |
kW-mo/yr
|
$3.83 |
Electricity Fees | $(-306,142.0) | - |
|
- |
TOTAL YEARLY COSTS | $2,442,713 | |||
RECOMMENDED SAVINGS* | $158,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,740 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $62,936 | $136,836 |
$64,992
1,237,925
kWh
|
$6,542
-
kW-mo/yr
|
$(-8,598.0) | |
02 | 2.7134: Use photocell controls | $5,531 | $2,748 |
$6,287
119,750
kWh
|
- | $(-756.0) | |
03 | 2.7135: Install occupancy sensors | $2,924 | $880 |
$3,323
63,277
kWh
|
- | $(-399.0) | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $13,905 | $500 |
$14,766
281,202
kWh
|
$1,039
-
kW-mo/yr
|
$(-1,900.0) | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,474 | $5,695 |
$13,904
264,793
kWh
|
$3,684
-
kW-mo/yr
|
$(-2,114.0) | |
06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $35,206 | $1,000 |
$38,870
740,242
kWh
|
$1,146
-
kW-mo/yr
|
$(-4,810.0) | |
07 | 2.4131: Size electric motors for peak operating efficiency | $21,010 | $28,800 |
$21,443
408,359
kWh
|
$2,144
-
kW-mo/yr
|
$(-2,577.0) | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,811 | $150 |
$1,836
34,961
kWh
|
$222
-
kW-mo/yr
|
$(-247.0) | |
TOTAL RECOMMENDED | $158,797 | $176,609 |
$165,421
3,150,509
kWh
|
$14,777
-
kW-mo/yr
|
$(-21,401.0) | ||
TOTAL IMPLEMENTED | $25,740 | $9,473 |
$25,350
482,781
kWh
|
$3,906
-
kW-mo/yr
|
$(-3,516.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs