Assessment Year | 2016 |
---|---|
Principal Product | Walk-in coolers and freezers |
NAICS | 334515: Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 163 |
Plant Area |
130,651
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,397 | 1,402,800 |
kWh
|
$0.081 |
Electricity Demand | $12,083 | 4,932 |
kW-mo/yr
|
$2.45 |
Electricity Fees | $16,233 | - |
|
- |
Natural Gas | $23,734 | 3,698 |
MMBtu
|
$6.42 |
TOTAL YEARLY COSTS | $165,447 | |||
RECOMMENDED SAVINGS* | $13,836 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,559 | $20,740 |
$6,252
77,334
kWh
|
$758
-
kW-mo/yr
|
$549 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,391 | $250 |
$1,882
23,279
kWh
|
$335
-
kW-mo/yr
|
$174 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,551 | $1,770 |
$1,244
15,390
kWh
|
$194
-
kW-mo/yr
|
$113 | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,758 | - |
$1,630
20,160
kWh
|
- | $128 | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $577 | $540 |
$441
5,461
kWh
|
$94
-
kW-mo/yr
|
$42 | |
TOTAL RECOMMENDED | $13,836 | $23,300 |
$11,449
141,624
kWh
|
$1,381
-
kW-mo/yr
|
$1,006 | ||
TOTAL IMPLEMENTED | $3,886 | $2,310 |
$3,315
41,011
kWh
|
$288
-
kW-mo/yr
|
$283 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs