ITAC Assessment: LL0360
ITAC logo
ITAC Assessment: LL0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Vegetable Oils
NAICS 311224: Soybean and Other Oilseed Processing
SIC 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 90,000
ft2
Annual Production 350,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,085,751 17,891,811
kWh
Electricity Demand $0.0 32,257
kW-mo/yr
Natural Gas $2,739,788 451,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $679,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $647,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.2135: Repair and eliminate steam leaks $627,674 $22,250 - $627,674
-
MMBtu
-
02 2.4226: Use / purchase optimum sized compressor $25,792 $5,600 $25,792
425,057
kWh
- -
03 2.2511: Insulate bare equipment $16,577 $1,321 - $16,577
-
MMBtu
-
04 2.7224: Reduce space conditioning during non-working hours $3,635 $810 $3,635
59,904
kWh
- -
05 2.7135: Install occupancy sensors $1,746 $4,980 $1,746
28,780
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,513 $1,050 $604
9,959
kWh
- $908
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,259 $3,570 $1,259
20,744
kWh
- -
08 2.6211: Conserve energy by efficient use of vending machines $530 $919 $530
8,736
kWh
- -
09 2.7111: Reduce illumination to minimum necessary levels $378 $390 $378
6,221
kWh
- -
TOTAL RECOMMENDED $679,104 $40,889 $33,944
559,401
kWh
$644,251
-
MMBtu
$908
TOTAL IMPLEMENTED $647,400 $28,581 $2,241
36,924
kWh
$644,251
-
MMBtu
$908
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs