ITAC Assessment: UA0163
ITAC logo
ITAC Assessment: UA0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Cabinets
NAICS 337110: Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434: Wood Kitchen Cabinets
Sales Range $100
M
to 500
M
# of Employees 645
Plant Area 535,000
ft2
Annual Production 905,990
units
Production Hrs. Annual 5,610
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $716,556 7,463,332
kWh
Electricity Demand $187,354 19,721
kW-mo/yr
Electricity Fees $66,318 -
Natural Gas $175,497 20,046
MMBtu
TOTAL YEARLY COSTS $1,145,725
RECOMMENDED SAVINGS* $124,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,711

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42,679 $9,795 $34,860
363,091
kWh
$5,301
-
kW-mo/yr
$2,518 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $18,730 $500 $15,212
158,437
kWh
$2,413
-
kW-mo/yr
$1,105 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $54,002 $184,407 $41,943
436,857
kWh
$8,873
-
kW-mo/yr
$3,186 -
04 2.7231: Use radiant heater for spot heating $8,072 $23,240 - - - $8,072
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,032 $900 $804
8,370
kWh
$171
-
kW-mo/yr
$57 -
TOTAL RECOMMENDED $124,515 $218,842 $92,819
966,755
kWh
$16,758
-
kW-mo/yr
$6,866 $8,072
-
MMBtu
TOTAL IMPLEMENTED $43,711 $10,695 $35,664
371,461
kWh
$5,472
-
kW-mo/yr
$2,575 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs