ITAC Assessment: UA0150
ITAC logo
ITAC Assessment: UA0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Hardwood Plywood
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $50
M
to 100
M
# of Employees 72
Plant Area 210,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 5,200
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $748,779 13,627,660
kWh
Electricity Demand $148,169 36,205
kW-mo/yr
Electricity Fees $7,319 -
Wood $72,362 48,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,829 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,421 $49,673 $21,188
385,590
kWh
$3,032
-
kW-mo/yr
$1,201
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,229 $2,995 $20,948
381,212
kWh
$2,136
-
kW-mo/yr
$1,145
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,195 $800 $6,760
123,020
kWh
$1,048
-
kW-mo/yr
$387
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,984 $15,128 $6,654
121,089
kWh
- $330
TOTAL RECOMMENDED $64,829 $68,596 $55,550
1,010,911
kWh
$6,216
-
kW-mo/yr
$3,063
TOTAL IMPLEMENTED $32,424 $3,795 $27,708
504,232
kWh
$3,184
-
kW-mo/yr
$1,532
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs