Assessment Year | 2015 |
---|---|
Principal Product | Small Car Parts |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 164 |
Plant Area |
125,000
ft2
|
Annual Production | 6,300
ton
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $861,299 | 13,505,382 |
kWh
|
$0.064 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,719 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,060 | $800 |
$9,131
143,183
kWh
|
$(-71.0) | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,659 | $2,995 |
$6,711
105,238
kWh
|
$(-52.0) | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,698 | $5,781 |
$4,735
74,250
kWh
|
$(-37.0) | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $46,229 | $200,000 |
$62,170
974,912
kWh
|
$(-485.0) |
$(-15,456.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $66,646 | $209,576 |
$82,747
1,297,583
kWh
|
$(-645.0) |
$(-15,456.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,719 | $3,795 |
$15,842
248,421
kWh
|
$(-123.0) | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs