ITAC Assessment: UA0144
ITAC logo
ITAC Assessment: UA0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Small Car Parts
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 164
Plant Area 125,000
ft2
Annual Production 6,300
ton
Production Hrs. Annual 4,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $861,299 13,505,382
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,060 $800 $9,131
143,183
kWh
$(-71.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,659 $2,995 $6,711
105,238
kWh
$(-52.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,698 $5,781 $4,735
74,250
kWh
$(-37.0) -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,229 $200,000 $62,170
974,912
kWh
$(-485.0) $(-15,456.0)
-
MMBtu
TOTAL RECOMMENDED $66,646 $209,576 $82,747
1,297,583
kWh
$(-645.0) $(-15,456.0)
-
MMBtu
TOTAL IMPLEMENTED $15,719 $3,795 $15,842
248,421
kWh
$(-123.0) -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs