ITAC Assessment: LE0410
ITAC logo
ITAC Assessment: LE0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 30
Plant Area 12,000
ft2
Annual Production 9,300
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $572,226 8,148,600
kWh
Electricity Demand $31,091 14,616
kW-mo/yr
Electricity Fees $69,709 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $369,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $369,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $63,492 $80 $60,945
870,638
kWh
$2,547
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $77,576 $400 $74,464
1,063,773
kWh
$3,112
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,237 $5,320 $4,067
58,094
kWh
$170
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,755 $5,880 $1,685
24,068
kWh
$70
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,739 $7,770 $1,605
22,932
kWh
$134
-
kW-mo/yr
06 2.7232: Replace existing hvac unit with high efficiency model $1,764 $8,200 $1,556
22,230
kWh
$208
-
kW-mo/yr
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $218,663 $1,120,000 $218,663
3,123,750
kWh
-
TOTAL RECOMMENDED $369,226 $1,147,650 $362,984
5,185,485
kWh
$6,242
-
kW-mo/yr
TOTAL IMPLEMENTED $369,226 $1,147,650 $362,984
5,185,485
kWh
$6,242
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs