ITAC Assessment: UA0139
ITAC logo
ITAC Assessment: UA0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Cedar Oil
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 41
Plant Area 150,000
ft2
Annual Production 440,920
lb
Production Hrs. Annual 8,064
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,467 4,258,522
kWh
Electricity Demand $152,659 15,790
kW-mo/yr
Electricity Fees $19,554 -
Wood $175,000 113,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.3321: Use steam pressure reduction to generate power $63,096 $121,500 $70,424
1,088,640
kWh
$15,662
-
kW-mo/yr
$3,306 $(-26,296.0)
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $45,863 $7,500 - - - $45,863
-
MMBtu
03 2.2414: Use waste heat from hot flue gases to preheat $43,191 $40,000 - - - $43,191
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $23,276 $3,627 - - - $23,276
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,428 $2,268 $5,227
80,794
kWh
- $201 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,395 $800 $2,666
41,206
kWh
$1,566
-
kW-mo/yr
$163 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,460 $2,995 $1,557
24,073
kWh
$812
-
kW-mo/yr
$91 -
TOTAL RECOMMENDED $187,709 $178,690 $79,874
1,234,713
kWh
$18,040
-
kW-mo/yr
$3,761 $86,034
-
MMBtu
TOTAL IMPLEMENTED $27,671 $4,427 $2,666
41,206
kWh
$1,566
-
kW-mo/yr
$163 $23,276
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs