ITAC Assessment: UA0127
ITAC logo
ITAC Assessment: UA0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product hardwood flooring
NAICS 321918: Other Millwork (including Flooring)
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 100,000
ft2
Annual Production 9,300
thousand feet
Production Hrs. Annual 5,145
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,755 4,684,781
kWh
Wood $109,960 67,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,708

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Wood Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $8,119 $9,967 $8,241
113,291
kWh
$(-122.0) -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,739 $6,195 $6,841
94,041
kWh
$(-102.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,280 $1,500 $1,299
17,853
kWh
$(-19.0) -
04 4.454: Modify startup/shutdown times $11,493 - - $11,493 -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,037 $28,162 $8,158
112,163
kWh
$(-121.0) -
06 2.7135: Install occupancy sensors $1,431 $95 $1,453
19,973
kWh
$(-22.0) -
07 2.7134: Use photocell controls $156 $116 $158
2,166
kWh
$(-2.0) -
08 2.2414: Use waste heat from hot flue gases to preheat $9,469 $40,000 - - $9,469
-
MMBtu
09 2.2136: Install / repair insulation on steam lines $220 $790 - - $220
-
MMBtu
TOTAL RECOMMENDED $46,944 $86,825 $26,150
359,487
kWh
$11,105 $9,689
-
MMBtu
TOTAL IMPLEMENTED $17,708 $48,485 $8,140
111,894
kWh
$(-121.0) $9,689
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs