Assessment Year | 2014 |
---|---|
Principal Product | hardwood flooring |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $10 M to 50M |
# of Employees | 102 |
Plant Area |
100,000
ft2
|
Annual Production | 9,300
thousand feet
|
Production Hrs. Annual | 5,145
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $340,755 | 4,684,781 |
kWh
|
$0.073 |
Wood | $109,960 | 67,049 |
MMBtu
|
$1.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,944 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,708 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Wood Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,119 | $9,967 |
$8,241
113,291
kWh
|
$(-122.0) | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,739 | $6,195 |
$6,841
94,041
kWh
|
$(-102.0) | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,280 | $1,500 |
$1,299
17,853
kWh
|
$(-19.0) | - | |
04 | 4.454: Modify startup/shutdown times | $11,493 | - | - | $11,493 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,037 | $28,162 |
$8,158
112,163
kWh
|
$(-121.0) | - | |
06 | 2.7135: Install occupancy sensors | $1,431 | $95 |
$1,453
19,973
kWh
|
$(-22.0) | - | |
07 | 2.7134: Use photocell controls | $156 | $116 |
$158
2,166
kWh
|
$(-2.0) | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $9,469 | $40,000 | - | - |
$9,469
-
MMBtu
|
|
09 | 2.2136: Install / repair insulation on steam lines | $220 | $790 | - | - |
$220
-
MMBtu
|
|
TOTAL RECOMMENDED | $46,944 | $86,825 |
$26,150
359,487
kWh
|
$11,105 |
$9,689
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,708 | $48,485 |
$8,140
111,894
kWh
|
$(-121.0) |
$9,689
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs