ITAC Assessment: UA0122
ITAC logo
ITAC Assessment: UA0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lumber Products
NAICS 333243: Sawmill, Woodworking, and Paper Machinery Manufacturing
SIC 3553: Woodworking Machinery
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 40,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 2,370
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $344,305 4,585,012
kWh
Electricity Demand $5,669 1,196
kW-mo/yr
Electricity Fees $26,897 -
Natural Gas $1,702 127
MMBtu
Wood $17,766 20,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,779 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,569

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.1113: Reduce combustion air flow to optimum $26,427 $700 $5,580
73,714
kWh
$498
-
kW-mo/yr
$467 $19,882
-
MMBtu
02 4.454: Modify startup/shutdown times $13,749 - - - $13,749 -
03 2.8112: Combine utility meters $87 - - - $87 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,325 $12,089 $9,682
127,895
kWh
$834
-
kW-mo/yr
$809 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,373 $7,195 $4,625
61,101
kWh
$364
-
kW-mo/yr
$384 -
06 2.4231: Reduce the pressure of compressed air to the minimum required $4,196 $100 $3,333
44,027
kWh
$563
-
kW-mo/yr
$300 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,622 $654 $2,435
32,164
kWh
- $187 -
TOTAL RECOMMENDED $63,779 $20,738 $25,655
338,901
kWh
$2,259
-
kW-mo/yr
$15,983 $19,882
-
MMBtu
TOTAL IMPLEMENTED $9,569 $7,295 $7,958
105,128
kWh
$927
-
kW-mo/yr
$684 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings