ITAC Assessment: UA0121
ITAC logo
ITAC Assessment: UA0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 88,836
ft2
Annual Production 52,618
thousand feet
Production Hrs. Annual 8,424
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $807,003 11,520,122
kWh
Electricity Fees $44,966 -
Wood $441,418 441,418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,355 $300 $18,355
262,020
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,866 $9,095 $11,866
160,462
kWh
-
03 2.1113: Reduce combustion air flow to optimum $27,986 $37,058 - $27,986
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $942 $1,018 - $942
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $68,373 $30,376 $68,373
976,057
kWh
-
TOTAL RECOMMENDED $127,522 $77,847 $98,594
1,398,539
kWh
$28,928
-
MMBtu
TOTAL IMPLEMENTED $11,866 $9,095 $11,866
160,462
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs