ITAC Assessment: UA0119
ITAC logo
ITAC Assessment: UA0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 45,000
thousand feet
Production Hrs. Annual 2,350
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $358,831 5,185,200
kWh
Electricity Demand $213,929 18,044
kW-mo/yr
Electricity Fees $(-23,821.0) -
Wood $375,182 238,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,922

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,645 $52,587 $12,365
178,682
kWh
$3,451
-
kW-mo/yr
$(-171.0) -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,604 $1,767 $1,622
23,445
kWh
- $(-18.0) -
03 2.2136: Install / repair insulation on steam lines $7,137 $8,685 - - - $7,137
-
MMBtu
04 2.1113: Reduce combustion air flow to optimum $34,015 $23,300 - - - $34,015
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $10,076 $1,000 $4,750
71,518
kWh
$5,436
-
kW-mo/yr
$(-110.0) -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,506 $5,595 $2,761
39,896
kWh
$1,794
-
kW-mo/yr
$(-49.0) -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,559 $100 $964
13,932
kWh
$612
-
kW-mo/yr
$(-17.0) -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,999 $823 $3,032
43,811
kWh
- $(-33.0) -
TOTAL RECOMMENDED $77,541 $93,857 $25,494
371,284
kWh
$11,293
-
kW-mo/yr
$(-398.0) $41,152
-
MMBtu
TOTAL IMPLEMENTED $41,922 $68,790 $23,872
347,839
kWh
$11,293
-
kW-mo/yr
$(-380.0) $7,137
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings