ITAC Assessment: UA0113
ITAC logo
ITAC Assessment: UA0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Metal Furniture
NAICS 337124: Metal Household Furniture Manufacturing
SIC 2514: Metal Household Furniture
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 750,000
ft2
Annual Production 214,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,580 3,698,041
kWh
Electricity Fees $26,940 -
Natural Gas $300,642 32,504
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $47,063 $93,733 $47,063
563,295
kWh
-
02 2.7145: Install skylights $31,556 $40,622 $31,556
377,685
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,580 $1,900 $6,580
78,757
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,732 $800 $1,732
20,735
kWh
-
05 2.7231: Use radiant heater for spot heating $10,526 $11,550 - $10,526
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,556 $321 $1,556
18,624
kWh
-
TOTAL RECOMMENDED $99,013 $148,926 $88,487
1,059,096
kWh
$10,526
-
MMBtu
TOTAL IMPLEMENTED $8,136 $2,221 $8,136
97,381
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs