ITAC Assessment: UA0110
ITAC logo
ITAC Assessment: UA0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Hydraulic Power Units
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 33,600
ft2
Annual Production 240,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,956 873,248
kWh
Electricity Demand $11,015 2,740
kW-mo/yr
Electricity Fees $4,265 -
Natural Gas $1,879 121
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,278

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7226: Use computer programs to optimize hvac performance $2,153 $50 $2,071
22,070
kWh
- $82
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,238 $3,565 $1,920
20,460
kWh
$233
-
kW-mo/yr
$85
03 2.7122: Disconnect ballasts $1,125 $800 $965
10,282
kWh
$117
-
kW-mo/yr
$43
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,229 $400 $1,054
11,235
kWh
$128
-
kW-mo/yr
$47
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,175 $2,330 $1,024
10,909
kWh
$106
-
kW-mo/yr
$45
TOTAL RECOMMENDED $7,920 $7,145 $7,034
74,956
kWh
$584
-
kW-mo/yr
$302
TOTAL IMPLEMENTED $3,278 $850 $3,036
32,352
kWh
$117
-
kW-mo/yr
$125
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs