Assessment Year | 2013 |
---|---|
Principal Product | Office Furniture |
NAICS | 337211: Wood Office Furniture Manufacturing |
SIC | 2521: Wood Office Furniture |
Sales Range | $50 M to 100M |
# of Employees | 750 |
Plant Area |
566,280
ft2
|
Annual Production | 450,000
pieces
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,590,515 | 23,712,921 |
kWh
|
$0.067 |
Electricity Fees | $246,861 | - |
|
- |
Natural Gas | $284,602 | 77,879 |
MMBtu
|
$3.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $410,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $107,285 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $52,762 | $41,601 |
$46,692
695,859
kWh
|
$6,070 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,672 | $4,500 |
$16,524
246,257
kWh
|
$2,148 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,165 | $800 |
$10,765
160,433
kWh
|
$1,400 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,674 | $4,500 |
$3,251
48,456
kWh
|
$423 | - | |
05 | 3.6123: Burn wood by-products for heat | $290,469 | $297,000 | - | $200,000 |
$90,469
-
MMBtu
|
|
06 | 2.1221: Replace obsolete burners with more efficient ones | $6,212 | $16,350 | - | - |
$6,212
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $7,049 | $12,413 |
$2,517
37,515
kWh
|
$327 |
$4,205
-
MMBtu
|
|
08 | 2.7122: Disconnect ballasts | $13,800 | $8,100 |
$12,212
182,002
kWh
|
$1,588 | - | |
09 | 2.3212: Optimize plant power factor | $6,000 | $14,980 | - | $6,000 | - | |
TOTAL RECOMMENDED | $410,803 | $400,244 |
$91,961
1,370,522
kWh
|
$217,956 |
$100,886
-
MMBtu
|
||
TOTAL IMPLEMENTED | $107,285 | $75,851 |
$89,444
1,333,007
kWh
|
$11,629 |
$6,212
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs