ITAC Assessment: UA0094
ITAC logo
ITAC Assessment: UA0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Office Furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 566,280
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,590,515 23,712,921
kWh
Electricity Fees $246,861 -
Natural Gas $284,602 77,879
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $410,803 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $107,285

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7241: Install outside air damper / economizer on hvac unit $52,762 $41,601 $46,692
695,859
kWh
$6,070 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,672 $4,500 $16,524
246,257
kWh
$2,148 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $12,165 $800 $10,765
160,433
kWh
$1,400 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,674 $4,500 $3,251
48,456
kWh
$423 -
05 3.6123: Burn wood by-products for heat $290,469 $297,000 - $200,000 $90,469
-
MMBtu
06 2.1221: Replace obsolete burners with more efficient ones $6,212 $16,350 - - $6,212
-
MMBtu
07 2.2511: Insulate bare equipment $7,049 $12,413 $2,517
37,515
kWh
$327 $4,205
-
MMBtu
08 2.7122: Disconnect ballasts $13,800 $8,100 $12,212
182,002
kWh
$1,588 -
09 2.3212: Optimize plant power factor $6,000 $14,980 - $6,000 -
TOTAL RECOMMENDED $410,803 $400,244 $91,961
1,370,522
kWh
$217,956 $100,886
-
MMBtu
TOTAL IMPLEMENTED $107,285 $75,851 $89,444
1,333,007
kWh
$11,629 $6,212
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs