ITAC Assessment: UA0084
ITAC logo
ITAC Assessment: UA0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Vehicle intorior parts and window motors
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 266,000
ft2
Annual Production 365,000
pieces
Production Hrs. Annual 6,468
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $854,913 12,425,822
kWh
Electricity Demand $850 2,833
kW-mo/yr
Electricity Fees $32,054 -
Natural Gas $22,254 1,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.7221: Lower temperature during the winter season and vice-versa $23,489 $160 $22,673
329,544
kWh
$816
02 2.7243: Improve air circulation with destratification fans / other methods $6,919 $640 $6,679
97,074
kWh
$240
03 2.7496: Install partitions to reduce size of conditioned space $5,106 $2,157 $4,929
71,639
kWh
$177
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,492 $9,195 $13,023
189,282
kWh
$469
05 2.4231: Reduce the pressure of compressed air to the minimum required $10,491 $800 $10,126
147,182
kWh
$365
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,837 $4,093 $1,773
25,775
kWh
$64
07 2.8123: Pay utility bills on time $812 $30 - $812
TOTAL RECOMMENDED $62,146 $17,075 $59,203
860,496
kWh
$2,943
TOTAL IMPLEMENTED $42,899 $11,542 $40,625
590,465
kWh
$2,274
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs