Assessment Year | 2012 |
---|---|
Principal Product | Vehicle intorior parts and window motors |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
266,000
ft2
|
Annual Production | 365,000
pieces
|
Production Hrs. Annual | 6,468
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $854,913 | 12,425,822 |
kWh
|
$0.069 |
Electricity Demand | $850 | 2,833 |
kW-mo/yr
|
$0.30 |
Electricity Fees | $32,054 | - |
|
- |
Natural Gas | $22,254 | 1,719 |
MMBtu
|
$12.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,146 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $23,489 | $160 |
$22,673
329,544
kWh
|
$816 | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $6,919 | $640 |
$6,679
97,074
kWh
|
$240 | |
03 | 2.7496: Install partitions to reduce size of conditioned space | $5,106 | $2,157 |
$4,929
71,639
kWh
|
$177 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,492 | $9,195 |
$13,023
189,282
kWh
|
$469 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,491 | $800 |
$10,126
147,182
kWh
|
$365 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,837 | $4,093 |
$1,773
25,775
kWh
|
$64 | |
07 | 2.8123: Pay utility bills on time | $812 | $30 | - | $812 | |
TOTAL RECOMMENDED | $62,146 | $17,075 |
$59,203
860,496
kWh
|
$2,943 | ||
TOTAL IMPLEMENTED | $42,899 | $11,542 |
$40,625
590,465
kWh
|
$2,274 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs