ITAC Assessment: UA0073
ITAC logo
ITAC Assessment: UA0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Film
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range less than $500
k
# of Employees 10
Plant Area 1,500,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,568
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,018 5,709,960
kWh
Natural Gas $903,616 180,723
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,345 $7,808 $5,345
86,211
kWh
-
02 2.7135: Install occupancy sensors $428 $1,100 $428
6,909
kWh
-
03 2.2414: Use waste heat from hot flue gases to preheat $12,335 $28,658 - $12,335
-
MMBtu
04 2.2511: Insulate bare equipment $3,261 $2,173 $3,261
52,590
kWh
-
05 2.2522: Isolate hot or cold equipment $25,253 $12,880 $13,576
218,976
kWh
$11,677
-
MMBtu
TOTAL RECOMMENDED $46,622 $52,619 $22,610
364,686
kWh
$24,012
-
MMBtu
TOTAL IMPLEMENTED $3,689 $3,273 $3,689
59,499
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs