ITAC Assessment: UA0070
ITAC logo
ITAC Assessment: UA0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Communications Equipment
NAICS 334290: Other Communications Equipment Manufacturing
SIC 3669: Communications Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 2,000
Plant Area 1,050,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 7,300
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,631,434 33,155,832
kWh
Electricity Demand $802,040 65,227
kW-mo/yr
Electricity Fees $(-175,039.0) -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7122: Disconnect ballasts $47,591 $5,500 $33,656
785,072
kWh
$17,923
-
kW-mo/yr
$(-3,988.0)
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $549 $845 $595
13,885
kWh
- $(-46.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,386 $2,900 $2,802
49,304
kWh
$825
-
kW-mo/yr
$(-241.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,557 $80 $2,824
49,678
kWh
$986
-
kW-mo/yr
$(-253.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,086 $15,744 $4,428
103,297
kWh
- $(-342.0)
TOTAL RECOMMENDED $59,169 $25,069 $44,305
1,001,236
kWh
$19,734
-
kW-mo/yr
$(-4,870.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs