ITAC Assessment: UA0065
ITAC logo
ITAC Assessment: UA0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fuel Filters
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 105,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,628 1,542,000
kWh
Electricity Demand $53,298 5,922
kW-mo/yr
Electricity Fees $22,551 -
Natural Gas $35,966 4,715
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,459 $24,444 $8,531
181,117
kWh
$4,410
-
kW-mo/yr
$518 - -
02 2.7135: Install occupancy sensors $668 $1,241 $642
13,637
kWh
- $26 - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,025 $800 $899
19,086
kWh
$1,048
-
kW-mo/yr
$78 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $702 $1,100 $375
7,956
kWh
$300
-
kW-mo/yr
$27 - -
05 2.2437: Recover waste heat from equipment $832 $1,935 - - - $801
-
MMBtu
$31
06 2.2223: Enhance sensitivity of temperature control and cutoff $510 $1,533 $490
10,395
kWh
- $20 - -
TOTAL RECOMMENDED $18,196 $31,053 $10,937
232,191
kWh
$5,758
-
kW-mo/yr
$669 $801
-
MMBtu
$31
TOTAL IMPLEMENTED $1,370 $2,341 $1,017
21,593
kWh
$300
-
kW-mo/yr
$53 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs