ITAC Assessment: UA0045
ITAC logo
ITAC Assessment: UA0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product office furniture
NAICS 337211: Wood Office Furniture Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 300,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $656,093 6,877,486
kWh
Electricity Demand $256,572 19,292
kW-mo/yr
Natural Gas $214,344 20,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $65,946 $165,576 $48,536
510,528
kWh
$17,410
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,354 $253 $1,354
14,240
kWh
- -
03 2.7231: Use radiant heater for spot heating $53,011 $50,388 - - $53,011
-
MMBtu
04 2.7233: Use properly designed and sized hvac equipment $29,964 $19,014 $14,177
148,486
kWh
$15,787
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $1,323 - $1,323
13,913
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $35,672 $740 $20,922
220,006
kWh
$14,750
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $27,056 $4,100 - - $27,056
-
MMBtu
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,605 $5,500 $3,520
36,676
kWh
$2,085
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,519 $3,616 $4,003
42,111
kWh
$1,516
-
kW-mo/yr
-
10 2.4133: Use most efficient type of electric motors $3,837 $10,250 $2,785
29,298
kWh
$1,052
-
kW-mo/yr
-
TOTAL RECOMMENDED $229,287 $259,437 $96,620
1,015,258
kWh
$52,600
-
kW-mo/yr
$80,067
-
MMBtu
TOTAL IMPLEMENTED $8,282 $5,753 $6,197
64,829
kWh
$2,085
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs