ITAC Assessment: UA0043
ITAC logo
ITAC Assessment: UA0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Coatings for Aircraft Part
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 7699: Repair Shops and Related Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 110,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $521,069 6,512,043
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,055 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,495 - $2,495
47,347
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,461 $1,500 $4,461
55,754
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,885 $11,676 $5,885
73,543
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $13,792 $29,183 $13,792
81,463
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,016 $10,675 $2,016
25,204
kWh
06 2.7134: Use photocell controls $352 $137 $352
4,397
kWh
07 2.7135: Install occupancy sensors $1,054 $625 $1,054
13,175
kWh
TOTAL RECOMMENDED $30,055 $53,796 $30,055
300,883
kWh
TOTAL IMPLEMENTED $6,956 $1,500 $6,956
103,101
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs