| Assessment Year | 2010 |
|---|---|
| Principal Product | Coatings for Aircraft Part |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 7699: Repair Shops and Related Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
110,000
ft2
|
| Annual Production | 25,000
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $521,069 | 6,512,043 |
kWh
|
$0.080 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,055 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,956 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,495 | - |
$2,495
47,347
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,461 | $1,500 |
$4,461
55,754
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,885 | $11,676 |
$5,885
73,543
kWh
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,792 | $29,183 |
$13,792
81,463
kWh
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,016 | $10,675 |
$2,016
25,204
kWh
|
|
| 06 | 2.7134: Use photocell controls | $352 | $137 |
$352
4,397
kWh
|
|
| 07 | 2.7135: Install occupancy sensors | $1,054 | $625 |
$1,054
13,175
kWh
|
|
| TOTAL RECOMMENDED | $30,055 | $53,796 |
$30,055
300,883
kWh
|
||
| TOTAL IMPLEMENTED | $6,956 | $1,500 |
$6,956
103,101
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs