Assessment Year | 2009 |
---|---|
Principal Product | molded parts |
NAICS | 334412: Bare Printed Circuit Board Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 253 |
Plant Area |
185,000
ft2
|
Annual Production | 7,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $504,610 | 7,501,901 |
kWh
|
$0.067 |
Electricity Demand | $76,018 | 18,510 |
kW-mo/yr
|
$4.11 |
Natural Gas | $49,782 | 3,177 |
MMBtu
|
$15.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,848 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,362 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,479 | - |
$2,118
44,618
kWh
|
$361
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,368 | $1,500 |
$4,615
97,243
kWh
|
$753
-
kW-mo/yr
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,426 | $3,200 | - | - |
$2,426
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $60 | $66 | - | - |
$60
-
MMBtu
|
|
05 | 2.2625: Chill water to the highest temperature possible | $174 | - |
$174
3,665
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,168 | $80,743 |
$24,252
511,005
kWh
|
$4,916
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,173 | $14,708 |
$3,203
67,486
kWh
|
$970
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $43,848 | $100,217 |
$34,362
724,017
kWh
|
$7,000
-
kW-mo/yr
|
$2,486
-
MMBtu
|
||
TOTAL IMPLEMENTED | $41,362 | $96,951 |
$34,362
724,017
kWh
|
$7,000
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs