Assessment Year | 2008 |
---|---|
Principal Product | Aircraft Parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 300 |
Plant Area |
92,500
ft2
|
Annual Production | 62,400
pieces
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $441,302 | 6,794,970 |
kWh
|
$0.065 |
Natural Gas | $132,969 | 8,709 |
MMBtu
|
$15.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,127 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,398 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,177 | $900 |
$2,177
33,516
kWh
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $3,601 | $17,000 |
$3,601
55,440
kWh
|
- | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,267 | - |
$2,267
35,100
kWh
|
- | |
04 | 2.7134: Use photocell controls | $131 | $111 |
$131
2,021
kWh
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $2,703 | $475 | - |
$2,703
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $23,591 | $34,365 |
$23,591
360,130
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,651 | $1,500 |
$1,651
25,414
kWh
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,006 | - |
$1,006
15,486
kWh
|
- | |
TOTAL RECOMMENDED | $37,127 | $54,351 |
$34,424
527,107
kWh
|
$2,703
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,398 | $111 |
$2,398
37,121
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs