Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Aircraft Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 92,500
ft2
Annual Production 62,400
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,302 6,794,970
kWh
Natural Gas $132,969 8,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,177 $900 $2,177
33,516
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $3,601 $17,000 $3,601
55,440
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $2,267 - $2,267
35,100
kWh
-
04 2.7134: Use photocell controls $131 $111 $131
2,021
kWh
-
05 2.2136: Install / repair insulation on steam lines $2,703 $475 - $2,703
-
MMBtu
06 2.2437: Recover waste heat from equipment $23,591 $34,365 $23,591
360,130
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,651 $1,500 $1,651
25,414
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,006 - $1,006
15,486
kWh
-
TOTAL RECOMMENDED $37,127 $54,351 $34,424
527,107
kWh
$2,703
-
MMBtu
TOTAL IMPLEMENTED $2,398 $111 $2,398
37,121
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs