ITAC Assessment: UA0024
ITAC logo
ITAC Assessment: UA0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Latex Gloves
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 269
Plant Area 180,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,957 6,983,000
kWh
Electricity Demand $56,859 11,937
kW-mo/yr
Electricity Fees $24,000 -
Natural Gas $1,682,412 194,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,342 - $5,586
107,729
kWh
$756
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,878 $1,500 $1,878
32,169
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,199 $14,155 $5,903
105,352
kWh
$296
-
kW-mo/yr
-
04 2.7122: Disconnect ballasts $1,392 $243 $1,226
23,657
kWh
$166
-
kW-mo/yr
-
05 2.2135: Repair and eliminate steam leaks $6,203 $300 - - $6,203
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $4,555 $2,415 - - $4,555
-
MMBtu
07 2.2425: Use flue gases to heat process or service water $98,000 $126,000 - - $98,000
-
MMBtu
08 2.4323: Use optimum size and capacity equipment $24,566 $23,000 - - $24,566
-
MMBtu
09 2.2437: Recover waste heat from equipment $42,744 $45,700 - - $42,744
-
MMBtu
TOTAL RECOMMENDED $191,879 $213,313 $14,593
268,907
kWh
$1,218
-
kW-mo/yr
$176,068
-
MMBtu
TOTAL IMPLEMENTED $20,370 $4,458 $8,690
163,555
kWh
$922
-
kW-mo/yr
$10,758
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs