Assessment Year | 2008 |
---|---|
Principal Product | paper and pulp |
NAICS | 322130: Paperboard Mills |
SIC | 2631: Paperboard Mills |
Sales Range | $100 M to 500M |
# of Employees | 490 |
Plant Area |
400,000
ft2
|
Annual Production | 425,000
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $7,000,000 | 130,000,000 |
kWh
|
$0.054 |
Coal | $1,916,810 | 1,168,000 |
MMBtu
|
$1.64 |
Wood | $1,168,000 | 5,840,000 |
MMBtu
|
$0.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $143,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $143,188 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $21,380 | - |
$21,380
397,399
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $59,923 | $1,050 |
$59,923
1,113,816
kWh
|
- | |
03 | 2.4235: Remove or close off unneeded compressed air lines | $33,016 | $402 |
$33,016
613,677
kWh
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $5,880 | $314 | - |
$5,880
-
MMBtu
|
|
05 | 2.4323: Use optimum size and capacity equipment | $22,989 | - |
$22,989
427,000
kWh
|
- | |
TOTAL RECOMMENDED | $143,188 | $1,766 |
$137,308
2,551,892
kWh
|
$5,880
-
MMBtu
|
||
TOTAL IMPLEMENTED | $143,188 | $1,766 |
$137,308
2,551,892
kWh
|
$5,880
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs