ITAC Assessment: UA0017
ITAC logo
ITAC Assessment: UA0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product paper and pulp
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 400,000
ft2
Annual Production 425,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,000,000 130,000,000
kWh
Coal $1,916,810 1,168,000
MMBtu
Wood $1,168,000 5,840,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,188

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $21,380 - $21,380
397,399
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $59,923 $1,050 $59,923
1,113,816
kWh
-
03 2.4235: Remove or close off unneeded compressed air lines $33,016 $402 $33,016
613,677
kWh
-
04 2.2136: Install / repair insulation on steam lines $5,880 $314 - $5,880
-
MMBtu
05 2.4323: Use optimum size and capacity equipment $22,989 - $22,989
427,000
kWh
-
TOTAL RECOMMENDED $143,188 $1,766 $137,308
2,551,892
kWh
$5,880
-
MMBtu
TOTAL IMPLEMENTED $143,188 $1,766 $137,308
2,551,892
kWh
$5,880
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs