Assessment Year | 2007 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 173 |
Plant Area |
225,579
ft2
|
Annual Production | 108,770
thousand feet
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $782,027 | 15,593,531 |
kWh
|
$0.050 |
Electricity Demand | $169,344 | 39,319 |
kW-mo/yr
|
$4.31 |
Natural Gas | $7,863 | 527 |
MMBtu
|
$14.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,070,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,320 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,155 | $700 |
$1,155
26,757
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,165 | - |
$2,165
50,162
kWh
|
- | - | |
03 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $1,063,171 | $5,532,000 |
$782,027
15,593,531
kWh
|
$169,344
-
kW-mo/yr
|
$111,800 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,620 | $9,817 |
$1,181
27,367
kWh
|
$439
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $737 | $7,504 |
$504
11,695
kWh
|
$233
-
kW-mo/yr
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,429 | $1,230 |
$1,122
26,379
kWh
|
$307
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $1,070,277 | $5,551,251 |
$788,154
15,735,891
kWh
|
$170,323
-
kW-mo/yr
|
$111,800 | ||
TOTAL IMPLEMENTED | $3,320 | $700 |
$3,320
76,919
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs