ITAC Assessment: UA0002
ITAC logo
ITAC Assessment: UA0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Rubber pipe gaskets
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 85,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,430 6,380,128
kWh
Electricity Demand $12,000 15,395
kW-mo/yr
Natural Gas $366,024 32,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $113,684 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 2.2511: Insulate bare equipment $20,117 $824 $20,117
327,214
kWh
- -
02 2.2511: Insulate bare equipment $34,488 $1,462 - $34,488
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $35,628 $600 - $35,628
-
MMBtu
-
04 3.4155: Meter waste water $6,725 - - - $6,725
-
Tgal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,648 $15,057 $5,648
91,866
kWh
- -
06 2.2136: Install / repair insulation on steam lines $11,078 $3,916 - $11,078
-
MMBtu
-
TOTAL RECOMMENDED $113,684 $21,859 $25,765
419,080
kWh
$81,194
-
MMBtu
$6,725
-
Tgal
TOTAL IMPLEMENTED $46,706 $4,516 - $46,706
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs