ITAC Assessment: TN0236
ITAC logo
ITAC Assessment: TN0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product ELECTRIC MOTORS
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 4,125
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,905 968,054
kWh
Fuel Oil #2 $17,312 2,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,574

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7212: Install or upgrade insulation on hvac distribution systems $2,574 $836 - $2,574
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $1,363 $5,000 - $1,363
-
MMBtu
03 2.2511: Insulate bare equipment $2,851 $62 $2,851
37,515
kWh
-
04 2.2514: Cover open tanks $727 $54 - $727
-
MMBtu
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $980 $1,550 $980
12,896
kWh
-
TOTAL RECOMMENDED $8,495 $7,502 $3,831
50,411
kWh
$4,664
-
MMBtu
TOTAL IMPLEMENTED $2,574 $836 - $2,574
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs